Incinerator / Waste-to-Energy / High-temp
- Target parts
- Boiler tubes, superheaters, combustion-chamber walls, flue-gas equipment, sensor sheaths
- Pain point
- 800–1200°C, HCl/SO₂/molten salt, corrosion, slagging, fouling, maintenance cost
- SAMUON value
- Required validation
- Thermal shock, high-temp corrosion, long-run, slagging, field coupon test
- Collaboration model
- Joint PoC · EPC/OEM co-development · gov R&D